2129-v1 |
EQUIPMENT & ENCLOSURE SCREEN SHOTS |
Justin L Tillman |
Posters
Vessel
Presentations to Others
Purification Filters
Installation at LArTF
Racks & Cabling
Cryogenics - WBS 1.2
Purity Monitors
Building Layout
About MicroBooNE
Other LAr Systems
Circulation & Filling
Purification
|
03 Oct 2012 |
15-v5 |
Argon Temperature and Velocity Profiles 13 watt/meter heat load |
BT Fleming |
Vessel
Cryo System Calculations
Circulation & Filling
|
22 Sep 2011 |
1160-v2 |
Conceptual Design for the MicroBooNE High Voltage Feedthrough and supply system |
Hans Jostlein |
Vessel
Detectors Assembly
uB HV FT Design & Fabrication
Field Cage
|
10 Dec 2010 |
941-v1 |
Epoxy for bonding the creadle to the tank |
Hans Jostlein |
Vessel
Ground & Shield
Electronics & Readout - WBS 1.5
|
14 May 2010 |
940-v1 |
EMI noise in the cryo tank |
Hans Jostlein |
Vessel
Ground & Shield
Electronics & Readout - WBS 1.5
|
14 May 2010 |
926-v1 |
MicroBooNE cryostat wall as EMI shield -- additional information |
Hans Jostlein |
Vessel
Ground & Shield
|
10 May 2010 |
912-v1 |
A Suitable Epoxy fro Bonding the Tank to the Foam Saddles |
Hans Jostlein |
Vessel
|
21 Apr 2010 |
636-v1 |
Vessel Heat Load Calculations |
Glenn Morgan |
Vessel
Vessel Insulation
Cryo System Calculations
|
04 Nov 2009 |
374-v21 |
Cryostat, Cryogenics and Purification CDR |
Larry Bartoszek et al. |
Vessel
TDR, CDR, Design Param
Internal Reviews
|
11 Jun 2009 |
435-v1 |
MicroBooNE Cryostat Vessel Market Survey and Budgetary Estimate |
J Sondericker |
Vessel
|
26 May 2009 |
482-v1 |
Pictures of Saddle Support Design |
Larry Bartoszek |
Vessel
|
06 Jul 2009 |