5990-v12 |
CRT DC Power Distribution |
David Lorca Galindo |
Racks & Cabling
CRT
Installation at LArTF
|
22 Mar 2017 |
2535-v1 |
Rack Build-Up Manual: How to Build an AC Switch Box |
Bryce R Littlejohn |
Racks & Cabling
|
16 May 2013 |
2536-v1 |
Rack Build-Up Manual: How to Build DC Distribution to TPC Readout Crate |
Bryce R Littlejohn |
Racks & Cabling
Cables/Connectors
LV PS
|
17 May 2013 |
2545-v1 |
Rack Build-Up Manual: How to Build a RPS Chassis |
Bryce R Littlejohn |
Racks & Cabling
|
23 May 2013 |
2563-v1 |
Rack Build-Up Manual: How to Prepare a Temperature Sensor |
Bryce R Littlejohn |
Racks & Cabling
|
06 Jun 2013 |
2662-v4 |
MicroBooNE Data and Network Cable Plant |
Linda F. Bagby et al. |
Racks & Cabling
Installation - WBS 1.7
DAQ & Monitoring - WBS 1.9
|
14 Aug 2013 |
3603-v2 |
LArTF Electronics Install Update - August 8 |
Bryce R Littlejohn |
Racks & Cabling
Installation - WBS 1.7
Installation at LArTF
|
08 Aug 2014 |
2401-v2 |
Safety and PPD Experimental installation of MicroBooNE |
John L Voirin |
Racks & Cabling
TPC Detector - WBS 1.4
Installation - WBS 1.7
Installation at LArTF
Detectors Assembly
|
06 Mar 2013 |
2129-v1 |
EQUIPMENT & ENCLOSURE SCREEN SHOTS |
Justin L Tillman |
Posters
Vessel
Racks & Cabling
Cryogenics - WBS 1.2
Presentations to Others
Purity Monitors
Building Layout
Purification Filters
About MicroBooNE
Other LAr Systems
Installation at LArTF
Circulation & Filling
Purification
|
03 Oct 2012 |