Document List by Topic

These documents on Time Projection Chamber Design & Fabrication - WBS 1.4 and sub-topics are available:

MicroBooNE-doc-# Title Author(s) Topic(s) Last Updated
6082-v1 LArTPC Detector Response Calculations Using Boundary Element Method Brett Viren Wire Planes
Ionization & Drift
11 Jul 2016
4708-v1 Wire Plane Analytic Calculations Glenn Horton-Smith TPC Detector - WBS 1.4
HV in LAr Studies & Models
17 Aug 2015
3558-v1 Field Response Analysis on Long Bo data Yun-Tse Tsai TPC Wires
26 Jun 2014
3362-v1 High statistics varistor test Jonathan Asaadi et al. Field Cage
08 Apr 2014
1895-v4 MicroBooNE Liquid Argon Flow Manipulation and Ion Buildup Model Erik A. Voirin Field Cage
14 Feb 2014
3155-v2 TPC Field Cage AC Measurements Dave Huffman Field Cage
04 Feb 2014
2413-v4 Quantifying TPC Field Errors George Mahler et al. TPC Detector - WBS 1.4
04 Sep 2013
2006-v3 Argon Bubbles around Field-Cage Resistor Hans Jostlein HV in LAr Studies & Models
Field Cage
21 Aug 2013
2401-v2 Safety and PPD Experimental installation of MicroBooNE John L Voirin TPC Detector - WBS 1.4
Installation at LArTF
Detectors Assembly
Racks & Cabling
Installation - WBS 1.7
06 Mar 2013
2032-v2 The Time Projection Chamber for the MicroBooNE Experiment at Fermilab Jonathan Asaadi Wire Planes
TPC Wires
23 May 2012
2000-v1 HV Feedthrough status April 2012 Hans Jostlein TPC Detector - WBS 1.4
27 Apr 2012
1901-v1 MicroBooNE LAr Flow Manipulation Erik A. Voirin Field Cage
16 Mar 2012
1804-v1 Thermal Stress for TPC Wires During Cooldown of Micro-Boone KC Wu et al. TPC Wires
15 Dec 2011
1805-v1 TPC Cart George Mahler et al. TPC Assy Fixtures
TPC Detector - WBS 1.4
Detectors & Vessel Integration
Vessel Supports
Detectors Assembly
15 Dec 2011
1707-v1 Shadowing by Wire Planes Hans Jostlein Wire Planes
Light
07 Sep 2011
342-v3 Electron Drift Velocity in the microBooNE TPC Kirk McDonald TPC Detector - WBS 1.4
Argon Properties Refs
20 Mar 2009
1160-v2 Conceptual Design for the MicroBooNE High Voltage Feedthrough and supply system Hans Jostlein Vessel
uB HV FT Design & Fabrication
Detectors Assembly
Field Cage
10 Dec 2010
1134-v1 uBooNE Detector GDML Update BT Fleming TPC Detector - WBS 1.4
Collaboration Meeting
21 Oct 2010
946-v1 Poster for Neutrino 2010 Vassili Papavassiliou PM Detector - WBS 1.8
Physics
TPC Detector - WBS 1.4
About MicroBooNE
07 Jun 2010
811-v1 Vibration of Wires in Liquid Argon Due to Fluid Flow Kirk McDonald TPC Wires
02 Feb 2010
808-v1 Strategies for Liquid Argon Detectors at DUSEL Kirk McDonald Physics
TPC Detector - WBS 1.4
02 Feb 2010
216-v1 Wire Motion Calculations R Schmitt Cryo System Calculations
TPC Wires
01 Feb 2010
191-v1 Copper Clad Wire Thermal Contraction Stress and Shock Test Mark Ruschman et al. Cryo System Calculations
TPC Wires
11 Nov 2008
181-v1 Wire Pitch Issues J Spitz Collaboration Meeting
24 Oct 2008

Number of documents found: 24

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ]

DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 3 wallclock secs ( 0.54 usr + 0.19 sys = 0.73 CPU)