Document List by Topic

These documents on Electronics & Readout - WBS 1.5 and sub-topics are available:

MicroBooNE-doc-# Title Author(s) Topic(s) Last Updated
2574-v3 helpful slides about the electronics connections database Jason St. John DAQ Software
Electronics & Readout - WBS 1.5
12 Jun 2013
2553-v1 Rack Build-Up Manual: How to Refurbish a Fan Pack Bryce R Littlejohn Racks & Cabling
Electronics & Readout - WBS 1.5
31 May 2013
2552-v3 PMT Triggering and Readout for MicroBooNE Experiment David Kaleko PM Readout
Trigger
30 May 2013
2536-v2 Rack Build-Up Manual: How to Build DC Distribution to TPC Readout Crate Bryce R Littlejohn LV PS
Racks & Cabling
Cables/Connectors
23 May 2013
2519-v2 Reception Test and Rack Infrastructure Update Bryce R Littlejohn Electronics & Readout - WBS 1.5
09 May 2013
2477-v1 MicroBooNE Electronics APS Talk David Kaleko PM Detector - WBS 1.8
TPC Detector - WBS 1.4
Trigger
About MicroBooNE
Electronics & Readout - WBS 1.5
10 Apr 2013
2462-v1 PMT DAQ Simulation Studies M Shaevitz PM Readout
DAQ & Online WG
04 Apr 2013
2424-v3 Reception Tests and Rack Infrastructure Update Linda F. Bagby et al. Assembly & Testing
Collaboration Mtg
14 Mar 2013
2358-v1 Nevis Electronics Test Stand Update David Kaleko Assembly & Testing
DAQ & Online WG
23 Jan 2013
2328-v1 Electronics Fuse Listing David Kaleko Electronics Refs
11 Jan 2013
1735-v6 All Rack Layouts September 2012 Linda F. Bagby et al. Electronics & Readout - WBS 1.5
04 Dec 2012
2297-v1 PMT Signal Path Simulations Dave Huffman Electronics & Readout - WBS 1.5
27 Nov 2012
2271-v2 Electronics Prototype Test Stand Description Gary Cheng All Meetings
Electronics Prototypes
Electronics & Readout - WBS 1.5
20 Nov 2012
1202-v2 Interface PMT-Electronics Arati Prakash Project Team Mtg
PM Detector - WBS 1.8
19 Jan 2011
1343-v1 Grounding and Shielding Techniques for Large Scale Experiments Marvin Johnson Building Layout
Ground & Shield
Electronics & Readout - WBS 1.5
16 Feb 2011
1150-v3 A Demo Prototype for Digitization at Feed Through with Single Slope ADC Jinyuan Wu Electronics WG
Digitizer
22 Nov 2010
1015-v1 Digitization at Feed Through R&D (2) Digitizer Performance Evaluation Other Other et al. Digitizer
19 Nov 2010
997-v4 Digitization at Feedthrough (1): Printed Circuit Design Other Other et al. Digitizer
19 Nov 2010
805-v2 Digitization at Feed Through Jinyuan Wu Electronics WG
Digitizer
19 Nov 2010
913-v1 Drawings of signal feedthroughs J Farrel Signal Feedthroughs
30 Jul 2010
941-v1 Epoxy for bonding the creadle to the tank Hans Jostlein Vessel
Ground & Shield
Electronics & Readout - WBS 1.5
14 May 2010
940-v1 EMI noise in the cryo tank Hans Jostlein Vessel
Ground & Shield
Electronics & Readout - WBS 1.5
14 May 2010
838-v1 Data Reduction Schemes for MicroBoone, CD-1 Review Jinyuan Wu Digitizer
Collaboration Mtg
18 Feb 2010
802-v1 Electrical Installation Guidelines Other Other Electronics Refs
Operational Readiness Reviews
Electronics & Readout - WBS 1.5
31 Jan 2010
638-v2 Data Reduction Schemes for MicroBoone Jinyuan Wu All Meetings
Electronics & Readout - WBS 1.5
30 Oct 2009
441-v2 Some Data Reduction Schemes for MicroBooNe Jinyuan Wu Internal Reviews
All Meetings
Digitizer
05 Jun 2009
197-v1 MicroBooNE FPGA processing Jinyuan Wu Electronics WG
Electronics & Readout - WBS 1.5
18 Nov 2008

Number of documents found: 27

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ]

DocDB Version 8.7.18, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.78 usr + 0.11 sys = 0.89 CPU)