2275-v4 Warm Readout Cable Routing and Lengths Linda F. Bagby et al. Infrastructure Integration
24 May 2013
2259-v1 Internal Note: Cleaning procedures for the TPC parts Jonathan Asaadi et al. TPC Detector - WBS 1.4
Detectors & Vessel Integration
Detectors Assembly
Detector Assembly Fixtures - WBS 1.10
01 Nov 2012
1204-v7 Interface PMT-Cryostat Craig Thorn Detectors & Vessel Integration
Project Team Mtg
PM Detector - WBS 1.8
23 May 2012
2005-v1 Front-End Electronics Cable Trays Dave Huffman Ground & Shield
01 May 2012
1897-v1 MicroBoone Isolation Transformer Wiring Diagram Dave Huffman Ground & Shield
06 Feb 2012
1805-v1 TPC Cart George Mahler et al. TPC Detector - WBS 1.4
TPC Assy Fixtures
Detectors & Vessel Integration
Vessel Supports
Detectors Assembly
15 Dec 2011
1779-v2 Electronics Infrastructure Linda F. Bagby DAQ & Monitoring - WBS 1.9
Infrastructure Integration
08 Dec 2011
1739-v2 75KVA Transformer Construction Dave Huffman Ground & Shield
20 Oct 2011
1202-v2 Interface PMT-Electronics Arati Prakash Project Team Mtg
PM Detector - WBS 1.8
19 Jan 2011
1506-v2 CMT Enclosure Design - Minutes from Meeting 25 May 2011 C James Building Layout
Infrastructure Integration
27 May 2011
1343-v1 Grounding and Shielding Techniques for Large Scale Experiments Marvin Johnson Building Layout
Ground & Shield
Electronics & Readout - WBS 1.5
16 Feb 2011
941-v1 Epoxy for bonding the creadle to the tank Hans Jostlein Vessel
Ground & Shield
Electronics & Readout - WBS 1.5
14 May 2010
940-v1 EMI noise in the cryo tank Hans Jostlein Vessel
Ground & Shield
Electronics & Readout - WBS 1.5
14 May 2010
926-v1 MicroBooNE cryostat wall as EMI shield -- additional information Hans Jostlein Vessel
Ground & Shield
10 May 2010

Number of documents found: 14

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ]

DocDB Version 8.7.18, contact Document Database Administrators
Execution time: 0 wallclock secs ( 0.44 usr + 0.05 sys = 0.49 CPU)