These documents on Installation WBS Tasks and sub-topics are available:

MicroBooNE-doc-# Title Author(s) Topic(s) Last Updated
5990-v12 CRT DC Power Distribution David Lorca Galindo Installation at LArTF
Racks & Cabling
CRT
22 Mar 2017
6216-v14 CRT Side-Support Structure Installation Documents John L Voirin Installation at LArTF
CRT
17 Aug 2016
6213-v2 CRT Bottom Panel Installation Documents John L Voirin Installation at LArTF
CRT
04 Aug 2016
5763-v2 CRT Review Martin Auger Installation at LArTF
06 May 2016
2527-v1 Wire Installation Status Ryan Grosso Detectors Assembly
Collaboration Meeting
10 May 2013
2535-v1 Rack Build-Up Manual: How to Build an AC Switch Box Bryce R Littlejohn Racks & Cabling
16 May 2013
2536-v1 Rack Build-Up Manual: How to Build DC Distribution to TPC Readout Crate Bryce R Littlejohn LV PS
Racks & Cabling
Cables/Connectors
17 May 2013
2545-v1 Rack Build-Up Manual: How to Build a RPS Chassis Bryce R Littlejohn Racks & Cabling
23 May 2013
2563-v1 Rack Build-Up Manual: How to Prepare a Temperature Sensor Bryce R Littlejohn Racks & Cabling
06 Jun 2013
2662-v4 MicroBooNE Data and Network Cable Plant Linda F. Bagby et al. DAQ & Monitoring - WBS 1.9
Racks & Cabling
Installation - WBS 1.7
14 Aug 2013
3066-v3 December 2013 All Experimenter's Meeting Update Bryce R Littlejohn uB Collaboration
Installation - WBS 1.7
09 Dec 2013
3603-v2 LArTF Electronics Install Update - August 8 Bryce R Littlejohn Installation at LArTF
Racks & Cabling
Installation - WBS 1.7
08 Aug 2014
4013-v1 New response curves for impedance monitor Glenn Horton-Smith et al. Infrastructure Integration
Ground & Shield
Installation at LArTF
Monitoring Systems
01 Jan 2015
3799-v1 Electrical installation progress Anne Schukraft Installation at LArTF
09 Oct 2014
3610-v2 MicroBooNE detector position in BNB neutrino beam after installation Virgil Bocean Installation at LArTF
24 Jul 2014
3533-v1 Vessel Transport John L Voirin Installation - WBS 1.7
13 Jun 2014
2401-v2 Safety and PPD Experimental installation of MicroBooNE John L Voirin Installation at LArTF
Detectors Assembly
TPC Detector - WBS 1.4
Racks & Cabling
Installation - WBS 1.7
06 Mar 2013
2262-v1 Cleaning the MicroBooNE TPc -- lessons learned Thomas Strauss Detectors Assembly
Collaboration Meeting
21 Feb 2013
2129-v1 EQUIPMENT & ENCLOSURE SCREEN SHOTS Justin L Tillman Vessel
Other LAr Systems
Installation at LArTF
About MicroBooNE
Circulation & Filling
Presentations to Others
Purification Filters
Cryogenics - WBS 1.2
Building Layout
Posters
Racks & Cabling
Purity Monitors
Purification
03 Oct 2012
2204-v1 MicroBooNE Update Jonathan Asaadi Detectors Assembly
10 Sep 2012
1805-v1 TPC Cart George Mahler et al. Detectors Assembly
TPC Assy Fixtures
TPC Detector - WBS 1.4
Detectors & Vessel Integration
Vessel Supports
15 Dec 2011
1648-v1 WBS 1.7 CD-2 Review Breakout Jen Raaf et al. DOE Reviews
Installation - WBS 1.7
01 Aug 2011
1160-v2 Conceptual Design for the MicroBooNE High Voltage Feedthrough and supply system Hans Jostlein Vessel
uB HV FT Design & Fabrication
Detectors Assembly
Field Cage
10 Dec 2010

Number of documents found: 23

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ]

DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 4 wallclock secs ( 0.74 usr + 0.12 sys = 0.86 CPU)