6247-v12 | CRT Top-Support Structure Installation Documents | Jason St. John et al. | CRT |
08 Mar 2017 |
6260-v15 | CRT Side-Panel Installation Documents | John L Voirin | CRT |
31 Aug 2016 |
6301-v6 | Installation procedure for CRT panels in LArTF | John L Voirin | CRT |
25 Aug 2016 |
6304-v1 | Vacuum daily inspection checklist | John L Voirin | CRT |
24 Aug 2016 |
6216-v14 | CRT Side-Support Structure Installation Documents | John L Voirin | Installation at LArTF CRT |
17 Aug 2016 |
6213-v2 | CRT Bottom Panel Installation Documents | John L Voirin | Installation at LArTF CRT |
04 Aug 2016 |
3533-v1 | Vessel Transport | John L Voirin | Installation - WBS 1.7 |
13 Jun 2014 |
2401-v2 | Safety and PPD Experimental installation of MicroBooNE | John L Voirin | Installation at LArTF Racks & Cabling Installation - WBS 1.7 TPC Detector - WBS 1.4 Detectors Assembly |
06 Mar 2013 |
1648-v1 | WBS 1.7 CD-2 Review Breakout | Jen Raaf et al. | DOE Reviews Installation - WBS 1.7 |
01 Aug 2011 |